ℹ️
🔒 Anda sedang melihat pratinjau soal
Login untuk ikuti tryout lengkap dengan timer, simpan jawaban, dan lihat skor akhir Anda.
Masuk dengan Google — Gratis
TOEFL ITP Preparation - Paket 06 TOEFL-ITP TOEFL ITP - Reading Comprehension

109. Read the following passage, then answer the question below.

For centuries, ships traveling between the Atlantic and Pacific oceans had to sail around the southern tip of South America, a voyage of many thousands of kilometers. A canal across the narrow Isthmus of Panama promised to shorten the journey dramatically, but the obstacles were formidable. The French, led by Ferdinand de Lesseps, who had built the Suez Canal, began digging in 1881. Lesseps planned a sea-level canal like Suez, yet Panama was not Egypt. The route crossed mountains, and heavy rains caused landslides that buried the excavations. Worse, tropical diseases, especially yellow fever and malaria, killed workers by the thousands. The company went bankrupt in 1889.

The United States took over the project in 1904 and succeeded largely by changing the plan. Chief engineer John Stevens argued that a sea-level canal was impractical and proposed instead a system of locks that would lift ships to an artificial lake, Gatun Lake, about twenty-six meters above sea level, and lower them on the other side. Meanwhile, the physician William Gorgas, convinced by the work of Carlos Finlay and Walter Reed that mosquitoes carry yellow fever, organized campaigns to drain standing water and to screen houses. Yellow fever was soon eliminated in the canal zone, and malaria declined sharply. The canal opened in 1914.

The achievement carried costs that are easy to forget. Thousands of laborers, many from the Caribbean, died during construction, and the creation of the lake flooded villages and forests. In addition, the United States held control over the Canal Zone for decades, a source of tension with Panama that ended only when the canal was transferred to Panamanian control in 1999. Today, ships pass through an expanded set of locks completed in 2016, which can handle vessels too large for the original channel.


It can be inferred that the 2016 expansion was undertaken because

Jawaban: A

Pembahasan: Pintu air baru dibangun untuk kapal yang terlalu besar bagi saluran asli.

Paket soal lain di kategori ini

Lanjut latihan dengan paket lain yang sejenis.

TOEFL ITP Preparation - Paket 13

TOEFL ITP Preparation - Paket 13

TOEFL ITP Preparation

140 soal · 115 menit

Lihat Bank Soal
TOEFL ITP Preparation - Paket 12

TOEFL ITP Preparation - Paket 12

TOEFL ITP Preparation

140 soal · 115 menit

Lihat Bank Soal
TOEFL ITP Preparation - Paket 11

TOEFL ITP Preparation - Paket 11

TOEFL ITP Preparation

140 soal · 115 menit

Lihat Bank Soal

Soal lain yang bisa kamu coba

Pilihan acak dari kategori yang sama.

Kategori terkait

Paket dari kategori yang masih satu rumpun.

Spelling Bee Grup C (SD) - Paket 09

Spelling Bee Grup C (SD) - Paket 09

Spelling Bee

50 soal · 60 menit

Lihat Bank Soal
Tes Koran Kraepelin

Tes Koran Kraepelin

Tes Koran (Pauli/Kraepelin)

30 soal · 30 menit

Lihat Bank Soal

Mungkin kamu juga tertarik

Seleksi Kompetensi Tambahan Tendik (Administrasi Perkantoran) - Paket 05

Seleksi Kompetensi Tambahan Tendik (Administrasi Perkantoran) - Paket 05

Seleksi Kompetensi Tambahan Administrasi Perkantoran

75 soal · 70 menit

Lihat Bank Soal
SKB Hukum 06

SKB Hukum 06

Seleksi Kompetensi Bidang

100 soal · 90 menit

Lihat Bank Soal
Matematika STIS - Paket 01

Matematika STIS - Paket 01

Seleksi Lanjutan Sekolah Kedinasan STIS

40 soal · 95 menit

Lihat Bank Soal
Memuat halaman...